PRICE REDUCED TO $35,000,000
9,114 Hours 3,989 Cycles (As of July 2013), Engines Fully Overhauled by KLM in 2007, Landing Gear Overhauled in January 2013, Maintenance Tracking Provided by CAMP Systems, Refurbished in 2013, the aircraft has New Carpet & the entire fluorescent lighting system was replaced with longer life (less maintenance) LED lighting system.
AIRFRAME / ENGINES / APU
Airframe
9,114 Hours
3,989 Cycles (As of July 2013)
Engines
Left & Right
Description GE CF6 80C2A2
Engine Total Time 9,013 Hours
Engine Cycles 4,304 Cycles
Thrust 58,000 lbs. each
APU
APU replaced with fresh tag – Excellent condition repaired unit
Description GTCP 331-25OH
APU Total Time 19,941 Hours
Leasing Şirketleri - TR